+44 207 394 30 90 (London)

The documents for the expansion of LNG plant in Sakhalin were presented to State expert review panel

Главная » News » The documents for the expansion of LNG plant in…

Engineering specifications for the construction of the third train of existing LNG plant in Sakhalin were presented to the state expert review panel. The information was delivered by the governor’s media service.

“Cederic Kremers,  Shell Chairman in Russia, stated that the engineering specifications for the construction of the third train of LNG plant were prepared and ready to be transmitted to the state expert review panel.

According to the head, the third train of LNG plant in Prigorodny can become one of the most economically viable LNG units in the world, performing lower risks.

“We expect that the final investment decision will be adopted next year. The train will be capable to produce 5.4m tonnes of LNG”, informs the media-service.

“Yesterday I had an opportunity to visit the plant and examine the operation. I have the best impressions – the plant is managed professionally and effectively, in compliance with all safety standards”, says Mr. Kremers.

“Sakhalin-2 is the one and only LNG plant in Russia. Project operator is Sakhalin Energy. The share of Gazprom is 51%, Shell – 26.5%, Mitsui & Co. Ltd. – 12.5%, Mitsubishi Corporation – 10%.

In June 2015, Gazprom and Shell signed a memorandum for the construction of the 3rd train of Sakhalin-2 LNG-project. The third train construction will enable the increase of plant capacity one and a half times – up to 15m tonnes.

Source: https://ria.ru/economy/20170928/1505724982.html

MORE

Russia presents a grandiose 5-year plan for the Arctic

The sum is 5.5 trillion rubles, Minister of Natural Resources Dmitry Kobylkin said in Monday’s government meeting in Sabetta. Along with Prime Minister Dmitry Medvedev and other key government ministers and business leaders, Kobylkin had made it to the remote site on the coast of the Yamal Peninsula. And that sum only covers the period…


Kremlin informs about potential involvement of Total in Arctic LNG 2 project

NOVATEK and Total plan to sign an agreement on the involvement of French oil and gas company in the new project for gas extraction and liquefaction “Arctic LNG 2″, informs Yury Ushakov, Assistant to the president. During the briefing held in Moscow, president’s assistant informed about the cooperation between Moscow and Paris. He noted that…


Novatek says ships 1st Yamal LNG cargo via Northern Sea Route

Russia’s largest independent natural gas producer, Novatek said Wednesday it shipped the first liquefied natural gas cargo from its giant Yamal LNG export plant via the Northern Sea Route. The 172,000-cbm ice-class LNG carrier Vladimir Rusanov left the Yamal LNG port in Sabetta on June 25 and is heading towards China, Mark Gyetvay, Novatek’s finance…